Dubai's green building rules are no longer a voluntary add-on. Under the Al Sa'fat system, every new building in the emirate has to meet a defined sustainability baseline before it can be permitted. For owners and contractors, understanding what that baseline covers, and who checks it, is part of planning a project from the first design review.
From regulations to a rating system
Dubai Municipality first issued the Dubai Green Building Regulations and Specifications in 2010, applying them to new government buildings and then, in a second phase, to all building types. In 2016 the Ruler of Dubai approved Al Sa'fat as a rating system, and the code was upgraded to classify buildings by their sustainability performance. According to Dubai Municipality, Al Sa'fat took effect on 19 October 2020 and replaced the 2010 regulations. Its legal basis is Administrative Resolution No. (154) of 2020, and a second edition of the system is dated January 2023.
The Sa'fa levels
The current official materials describe three levels, each called a Sa'fa. Some earlier commentary mentions a Bronze level, but Dubai Municipality and the Dubai Media Office refer to Silver, Gold and Platinum, so that is the structure used here.
| Level | Status | Certificate validity (Resolution 154 of 2020) |
|---|---|---|
| Silver Sa'fa | Mandatory for new buildings | 15 years for most building types; indefinite for private villas and industrial buildings |
| Gold Sa'fa | Optional | 5 years |
| Platinum Sa'fa | Optional | 5 years |
A building that applies for a higher level must meet every requirement of that level and of the levels below it. The Dubai Media Office (December 2023) cites energy savings of 19% for Silver, 32% for Gold and 35% for Platinum, and reports that 72,000 buildings, or 58% of the emirate's total, met green building specifications by the second quarter of 2023.
Which buildings must comply
The bylaw applies to buildings permitted after it came into force, and to later additions or modifications. It names private and investment villas, residential, commercial, public, industrial and mixed-use buildings. Temporary buildings due to be demolished within two years are excluded. Certain Silver requirements are optional for private villas, investment villas and industrial buildings unless the owner applies for a higher level. Buildings permitted under the earlier 2011 resolution may apply voluntarily, and the Dubai Media Office notes that older buildings must meet the system when they are reconstructed.
The Director General of Dubai Municipality may grant exemptions on an owner's request in limited cases: special-purpose buildings where compliance is not feasible, heritage buildings, and buildings using new technologies that deliver equal or greater savings.
What the requirements cover
The bylaw states its aims as improving energy and water efficiency, material use, building integrity, and the health and safety of occupants. Dubai Municipality adds that the system seeks to reduce energy consumption, improve the efficiency of electrical and mechanical systems and cut the carbon footprint. In practice the technical detail sits in the Al Sa'fat document and in the Dubai Building Code, which was established by Decree No. (45) of 2021. The Dubai Media Office says the Code makes the design prerequisites of Silver Sa'fa mandatory. Two Parts of the Code are directly relevant to building services:
- Part H covers HVAC, water supply, drainage, lighting and commissioning. It follows ASHRAE standards and includes minimum Al Sa'fat requirements.
- Part E, on the building envelope, includes sections on energy conservation and sustainable materials drawn partly from Al Sa'fat.
The specific thresholds, such as insulation values or fixture flow rates, should be read from the current edition of the document rather than from summaries.
The role of DEWA and district cooling
Part G of the Dubai Building Code covers incoming utilities. It includes the relevant electrical requirements of the Dubai Electricity and Water Authority (DEWA), DEWA water metering and the common requirements of district cooling providers. Design teams therefore deal with DEWA requirements inside the same code they use for green compliance.
DEWA also runs Shams Dubai, its rooftop solar programme, which allows building owners to connect solar panels to the grid. DEWA reported more than 725 MW of rooftop capacity connected across more than 8,430 buildings (press statement, 2025, as reported by Zawya). On cooling, Executive Council Resolution No. (6) of 2021 gives the Regulatory and Supervisory Bureau oversight of district cooling and requires developers to provide the service corridors needed for district cooling networks. We found no rule in the sources reviewed that obliges every new building to connect to district cooling, so that should be confirmed project by project.
The wider energy and climate context
Al Sa'fat sits within longer-term targets. In September 2025 the Dubai Supreme Council of Energy restated the Dubai Clean Energy Strategy 2050 goal of sourcing 100% of the emirate's energy production capacity from clean sources by 2050, alongside the Dubai Net Zero Carbon Emissions Strategy 2050. At national level, the UAE announced its Net Zero by 2050 Strategic Initiative on 7 October 2021, the first such commitment in the Middle East and North Africa region, with the Ministry of Climate Change and Environment leading implementation. The Dubai Media Office also reports that Dubai aims to achieve net zero energy buildings by 2035.
The Dubai Green Building System has reduced carbon dioxide emissions by approximately 2.28 million metric tonnes (Dubai Media Office, December 2023).
Practical implications
For owners, the Silver baseline should be set as a design requirement at briefing stage, because the Building Permit Department verifies compliance and issues the Sa'fa certificate. Choosing Gold or Platinum is a commercial decision: the Dubai Media Office notes that developers who obtain certification receive incentives, but each higher level carries additional requirements to document and verify.
For contractors, the main points are coordination and evidence. Mechanical and electrical packages, glazing, insulation and sanitary fittings all feed into the compliance record, so substitutions during construction need to be checked against the approved design. Certificates also expire and must be renewed, which matters for buildings kept in long-term ownership.
How this connects to Le Portail
Le Portail's Contracting division carries out electromechanical and structural engineering works with a focus on sustainable infrastructure. Owners planning a project in Dubai can discuss how the green building baseline affects scope and sequencing with the team. See Contracting or get in touch.
This article is general information, not legal or technical advice. Requirements are updated from time to time, so confirm details with Dubai Municipality, DEWA or the relevant authority before making decisions.
Sources
- Dubai Municipality: Al Sa'fat, Dubai Green Building System (accessed November 2026)
- Dubai Legislation Portal: Administrative Resolution No. (154) of 2020 concerning the Bylaw on the Dubai Green Building System (accessed November 2026)
- Dubai Media Office: Green Buildings in Dubai (December 2023) (accessed November 2026)
- Dubai Legislation Portal: Decree No. (45) of 2021 concerning the Dubai Building Code (accessed November 2026)
- Dubai Development Authority (hosting the Dubai Building Code overview): Objectives, structure and Parts of the Dubai Building Code (accessed November 2026)
- Dubai Legislation Portal: Executive Council Resolution No. (6) of 2021 regulating district cooling services (accessed November 2026)
- Zawya: Shams Dubai rooftop solar capacity reaches 725 MW across 8,430 buildings (accessed November 2026)
- Dubai Media Office: Dubai Supreme Council of Energy (September 2025) (accessed November 2026)
- UAE Media Office: UAE announces Net Zero by 2050 strategic initiative (October 2021) (accessed November 2026)